01379 741 860info@stantonandstubbs.co.ukGet in Touch

Our Work

The jobs, start to finish.

Hotels, student accommodation, manufacturing workshops and new-build homes. Every project here was wired, tested and signed off by our own team.

Projects
9
Commercial
6
Residential
3
Club Quarters Hotel, Gracechurch Street, London City

Every project

Showing 9 projects

Club Quarters Hotel, Gracechurch Street, London City
CommercialHospitality & Leisure

Club Quarters Hotel, Gracechurch Street, London City

7 Gracechurch Street, London EC3V 0DR

Stanton & Stubbs delivered a phased electrical refurbishment at Club Quarters Gracechurch, upgrading guestroom, en-suite, corridor, reception and communal area services across multiple floors. The works included validation surveys, electrical strip-out, new guestroom distribution boards, rewiring, lighting, small power, data, TV and telephone outlets, LED mirror installations, AC controller replacements, sub-main distribution and corridor lighting alterations. The reception area also formed part of the refurbishment, requiring careful coordination to maintain a professional front-of-house environment while works were undertaken. The project required detailed planning within a live hotel setting, with works sequenced to minimise disruption to guests, staff and daily operations. Stanton & Stubbs worked closely with other trades to maintain consistency across multiple room types while adapting to site discoveries, design changes and project variations throughout the programme.

View project
Hyatt Regency London Stratford
CommercialHospitality & Leisure

Hyatt Regency London Stratford

10A, Chestnut Plaza, Westfield Stratford City, London E20 1GL

Stanton & Stubbs were appointed to deliver the electrical package for the refurbishment works at HI Stratford, supporting the upgrade of guest accommodation, public areas and back-of-house spaces across multiple floors. Our scope included strip-out works, validation of existing electrical, data, TV and BT systems, distribution board alterations, small power, lighting, containment, data infrastructure and associated testing. We also carried out the installation and connection of a wide range of feature and functional lighting, including bedroom lighting, corridor lighting, WC fittings, lift lobby lighting and client-supplied decorative fittings. The project required careful coordination with the wider refurbishment programme, including works within live hotel environments, revised layouts, phased floor-by-floor delivery and integration with specialist systems and client-supplied equipment. Additional works included temporary power and lighting, data rack requirements, access control wiring, CCTV cabling, fibre links, remedial works and various return visits to support final completion. Stanton & Stubbs completed the works with a flexible and proactive approach, helping to deliver a high-quality finish for the upgraded hotel spaces.

View project
Radisson Red - Twickenham Rugby Stadium Hotel
CommercialHospitality & Leisure

Radisson Red - Twickenham Rugby Stadium Hotel

Twickenham

We were tasked with carrying out the refurbishment of the Twickenham Stadium Hotel. This involved wiring alterations to 150 guest rooms, remodeeling the corridors & then the re-wiring of the front of house sections. We also helped our client value engineer certain sections of the project to offer an overall saving while still delivering a quality finish.

View project
IQ Stevenson House
CommercialStudent Accommodation

IQ Stevenson House

Stephenson House, Stoddart St, Shieldfield, Newcastle upon Tyne NE2 1AW

iQ Stevenson House, Newcastle – Student Accommodation Electrical Refurbishment We carried out a full package of electrical refurbishment works to the communal and social spaces at iQ Stevenson House student accommodation in Newcastle. The project covered the main corridor, social room, study room and games room, helping transform the areas into modern, functional spaces for studying, socialising and leisure. Our works included alterations to the existing galvanised conduit systems to suit the new layouts, repositioning lighting so fittings were centred within the ceiling bays, and installing new conduit containment throughout the refurbished areas. We also replaced existing light fittings and emergency bulkheads, installed additional power points, desk trunking, metal-clad sockets, switched fused spurs and new electric heaters. Within the study and social spaces, we installed aluminium bench trunking to provide integrated power to desks and workstations, including multiple double sockets for student use. In the games room and social areas, we adapted power and lighting circuits to suit the new furniture layouts, leisure equipment and feature lighting. Additional works included the installation of heater supplies, speaker supplies, TV bracket and screen mounting, RCBO upgrades for RCD protection, and full testing, inspection and certification of all new and altered circuits. The completed works helped deliver a fresh, practical and contemporary student environment, combining exposed industrial-style electrical containment with clean modern finishes across the refurbished communal areas.

View project
Hybrid Tune
CommercialIndustrial & Logistics

Hybrid Tune

Renvale Technology Park Eye Road Brome Suffolk IP23 8AS

Stanton & Stubbs Ltd completed the electrical installation for Hybrid Tune’s specialist vehicle performance centre, delivering a robust and practical system to support a busy automotive tuning and dyno testing environment. The works included workshop power, lighting, distribution boards, containment, cable tray, local isolation and electrical supplies for technical areas and specialist equipment. The installation was designed to be durable, accessible and neatly presented, with exposed conduit and containment carefully installed to suit the clean industrial finish of the building. The result is a professional electrical infrastructure that supports Hybrid Tune’s day-to-day operations across its workshop bays, dyno room, service areas and back-of-house spaces.

View project
Osborn & Kent Construction
ResidentialMulti-Plot New Builds

Osborn & Kent Construction

Caistor St Edmund

This was a development of 15 new dwelliings. Consisiting of a mixture of 10 privatly owned bungalows & 5 affordable rent properties. The quality of the finish product was exceptional.

View project
Burgess Homes
ResidentialSingle-Plot New Build

Burgess Homes

Burgess Homes, Redgrave

Burgess homes are a very repitable house builder in the local area and we were very pleased to be approached to work with them on there bespoke developments. It is always nice to work with builders who maintain a safe & tidy working enviroment. We have now been working with Burgess homes since 2020 and stiull maintain a good working relationship.

View project
Hatch Homes - Blofield
ResidentialMulti-Plot New Builds

Hatch Homes - Blofield

Blofield, Norwich

We were awarded the contract to wire 9 four/five bedrooom luxury houses as well as 4x affordable houses. During the project our remit was to ensure the luxury finish of the properties but also suggesting alteranitve products to keep with in budget. We comlpeted this site with in time and the finish was exceptional.

View project
Renvale LTD
CommercialIndustrial & Logistics

Renvale LTD

Renvale buisness park - Eye, Suffolk

We were asked to tender for the new head offices & manufacturing workshop for Renvale LTD. Renvale has provided World leading wiring harness design and manufacturing services to the automotive & motorsport industries so we very pleased to be invloved with such a well respected client. We won the electrical package and then was also asked to take on the mechanicle packages with in our scope of works. We were asked to value engineer certain items with a brief of making sure we met the design criteria and ensuring a quality finish. One trick aspect of the job was trying to main tian the correct lux levels on the manufacturing floor but we were able to acheive this and maintian the sleek finish required.

View project

Electrical contractors in Norfolk & Suffolk

Commercial electrical contractors

We handle full electrical fit-out and refurbishment for offices, hotels, hospitals, universities, student accommodation and specialist facilities. That means lighting design, power distribution, data cabling, emergency lighting, testing and certification, all managed by one team with one point of contact. Our project management and paperwork are built for main contractors and public sector procurement, so tenders, RAMS and handover documents arrive complete and on time.

Residential electricians

On the domestic side we take on full house rewires, period property renovations, new build housing, estate developments, consumer unit upgrades, EV charger installation and smart home automation. We work cleanly around you and the other trades, dust sheets down, and every job leaves site tested, certified and signed off.

Where we work

Our base is The Old Sack Factory in Scole, Norfolk, which puts us on the Norfolk and Suffolk border. Most weeks that means Diss, Norwich, Bury St Edmunds, Ipswich, Thetford, Attleborough, Eye, Harleston and the villages in between. For larger commercial contracts we travel nationwide, including recent work in London and across the South East.

Accredited and insured

Stanton & Stubbs is an NICEIC Approved Contractor holding both the Domestic and Approved commendations, and we are CHAS accredited for health and safety. We are reassessed every year, with an assessor inspecting our paperwork, certification and three previous jobs picked at random. Over 20 years on site, that standard has not slipped.

Let's talk about your project.

Drop us a line or give the office a ring — we usually come back within the working day, often within the hour.

Leave at least one so we can get back to you.

No obligation. We'll get back to you within the working day.